Abstract
Prefabricated construction, as an emerging architectural model, has the characteristics of fast construction process and flexible design, and has been widely used in the field of architecture in China. As the core component of prefabricated buildings, the schedule of prefabricated components directly affects the progress and quality of the project. This study extends the volume of prefabricated components from a single building to a group of buildings, designs and solves an intelligent scheduling scheme model based on project construction schedule and procurement plan, and proposes two reference building group scheduling schemes and their applicable conditions. Genetic algorithm is used to optimize vehicle scheduling and transportation paths to achieve intelligent scheduling of prefabricated components in prefabricated building groups, ensuring project progress and quality.